Buhasa-de-bottlenecking & Associated Piping Adnoc Gas Processing Project
The Buhasa De-Bottlenecking & Associated Piping Project for ADNOC Gas Processing aims to enhance the capacity and efficiency of the existing gas processing facilities at Bu Hasa. The project involves modification and rerouting of process and utility pipelines, installation of new valves and tie-ins, upgrading instrumentation, and replacing critical equipment to eliminate operational bottlenecks.
These works are designed to improve flow distribution, increase production throughput, and ensure safe, reliable, and optimized plant operations in line with ADNOC standards.