Projects

Projects

Delivering Excellence Through Global Valve Solutions

With decades of engineering expertise and a proven track record in supplying high-performance valves to the oil, gas, petrochemical, and energy sectors, BTL-GT Valves has successfully executed numerous major projects across the UAE and international markets. Leveraging Boteli’s advanced technology and Gulftech’s execution capability, our valves are trusted for reliability, safety, and long-term performance in critical applications. Each project reflects our commitment to quality, innovation, and seamless supply to renowned energy operators—especially within ADNOC’s extensive network.

Pipeline Isolation & Flow Control Upgrade

Supply of Double Ball Valves, Gate Valves, and Through Conduit Valves for pipeline expansion and isolation systems, ensuring zero leakage performance and improved operational safety.

Wellhead & Platform Valve Package

Delivered corrosion-resistant Ball Valves and Butterfly Valves engineered for offshore environment conditions, supporting stable flow control and long service life under high salinity and pressure.

Petrochemical Processing Units

Provision of specialized Double Ball Valves and heavy-duty Gate Valves designed to handle high-temperature and high-pressure media in refining and petrochemical applications.

Gas Transmission Network

Installed Through Conduit Valves and Floating Ball Valves for high-capacity gas transmission lines, optimized for smooth flow and efficient pigging operations.

Rehabilitation And Integrity Reinstatement

Rehabilitation And Integrity Reinstatement Of Flowlines And Trunk Lines In Bab And Asab – 107105 Adnoc Onshore Project The ADNOC ...

Procurement And Construction Of Flowlines

Procurement And Construction Of Flowlines And Wellhead Installations At Asab And Sahil (Package-1, Part-1) Adnoc Onshore Project The project involves ...

Lower Zakum Long Term Development

Lower Zakum Long Term Development Phase-1 (Lz-ltdp-1) New Main Gas Line (Nmgl) Adnoc Offshore Project The Lower Zakum Long Term ...

Hail & Ghasha Development Project

Hail & Ghasha Development Project – Onshore Facilities Adnoc Onshore Project The Hail and Ghasha development design combines innovative decarbonization ...

Epc For Rsf (Rim Seal Fire)

Epc For Rsf (Rim Seal Fire) And Fsf (Full Surface Fire) Fighting System Upgrade For Cos Tanks At Zirku Adnoc ...

Epc For Miscellaneous Works

Epc For Miscellaneous Works At Tpo And Gas Fields Adnoc Onshore Project The project scope consists of Engineering, Procurement and ...

Epc For Maximize Ethane Recovery

Epc For Maximize Ethane Recovery & Monetization (Meram) Adnoc Gas Project Purpose is to Maximize Ethane Recovery and Monetization (MERAM). ...

Epc For Borouge 4 Project

Epc For Borouge 4 Project Borouge 4 is one of the largest industrial projects underway in the UAE. The project, ...

Epc For Bab Integrated Facilities

Epc For Bab Integrated Facilities Project (Bifp) Adnoc Onshore Project The BAB Integrated Facilities Project (BIFP) is an ADNOC Onshore project to upgrade ...

Tie-in At Shah Qusahwira Mender

Call Out Services Agreement For Tie-in At Shah-qusahwira-mender The Project “EPC for Tie-in Works at SQM (Package-4)” is initiated to ...

Tie-in At Asabsahil

Call Out Services Agreement For Tie-in At Asabsahil (Package-3) Adnoc Onshore Project This is a call-out agreement, meaning Galfar will ...

Buhasa-de-bottlenecking & Associated Piping

The hardware construction as the basic project of enterprise development, the implementation of machine replacement every year invested nearly 10 ...

Belbazem Field

Belbazem Field The Belbazem offshore project is an Abu Dhabi National Oil Company (ADNOC) initiative where the National Petroleum Construction Company ...

BAB Onshore Field Upgrade

The hardware construction as the basic project of enterprise development, the implementation of machine replacement every year invested nearly 10 ...

Al Dabb’iya Surface Facilities

Al Dabb’iya Surface Facilities Phase III of Al Dabb’iya project is part of the Northeast Bab (NEB) development program of ...

Al Dhafra Petroleum Operations

The hardware construction as the basic project of enterprise development, the implementation of machine replacement every year invested nearly 10 ...